Construction—EMEA—Austria—Slope Stabilizations
The stabilization of the embankment required
1,170 R32-320kN DYWI ® Drill Soil Nails with a
total length of 7,400m, 50 R38-550kN
DYWI ® Drill Soil Nails with a total length of 370m
and 130 R51-660kN DYWI ® Drill Soil Nails with
a total length of 900m.
For the foundation of the rockfall protection
structures, 185, 43.5mm Ø GEWI ® Plus Bar
Anchors with a total length of 400m were used
according to the system description provided
by the manufacturer. All of the systems were
supplied complete with accessories.
Owner
ÖBB Infrastruktur AG, Austria
General Contractor
Swietelsky Bauges.m.b.H., Austria
Consulting Engineers
IBK Ingenieurbüro Kronawetter ZT
Gesellschaft mbH, BGG Consult
Dr. Peter Waibel ZT GmbH and PULSE
Engineering GmbH, all of them Austria
DSI Unit
DYWIDAG-Systems International GmbH,
Austria
DSI Scope
Production, supply
DYWIDAG Products
1,170 R32-320kN DYWI ® Drill Soil Nails,
50 R38-550kN DYWI ® Drill Soil Nails,
130 R51-660kN DYWI ® Drill Soil Nails,
185, 43.5mm Ø GEWI ® Plus Bar Anchors
69