Construction—APAC—Brunei—Bridges
In the district of Bukit Beruang that has
considerably grown within the last few
years, another new bridge was built at the
Persimpangan Lebuhraya Tutong Telisai/Jalan
Perumahan Bukit Beruang Junction to relieve
traffic.
The 4 lane viaduct consists of two spans,
each 30m long and 23m wide. The reinforced
concrete deck is supported by 13, 30m long
PSPC T-girders.
Each of the girders was post-tensioned
using two Type 15-0.62" and one Type
19-0.62" DYWIDAG Tendons.
In total, the construction of the new
flyover in Bukit Beruang required 52 Type
15-0.62" DYWIDAG Strand Tendons
and 26 Type 19-0.62" DYWIDAG Strand
Tendons with a total strand tonnage
of 44t. Utracon also provided the steel
formwork for casting the T-beams.
Project Information Bukit Beruang
Owner
Jabatan Kerja Raya Negara, Brunei
General Contractor
Surati Construction Sdn. Bhd., Brunei
Subcontractor
Hunt Concrete Industries Co. Sdn. Bhd., Brunei
Consulting Engineers
Jurutera Tempatan Sdn. Bhd., Brunei
DSI Licensee
Utracon Overseas Pte Ltd., Singapore
Utracon Scope
Supply, installation, technical support, supervision
DYWIDAG Products
52 Type 15-0.62" DYWIDAG Strand Tendons,
26 Type 19-0.62" DYWIDAG Strand Tendons with
anchorages and accessories; formwork