Construction—APAC—Australia—Commercial Buildings All 37 strands in one cable were installed parallel to prevent entangling and friction of the individual strands in each cable bundle. Due to limitations in stressing space and maximum weight restrictions, stressing was carried out using a monostrand jack. In total, 10 DYWIDAG Strand Post-Tensioning Tendons were used. DSI not only supplied the necessary DYWDAG Post-Tensioning Tendons, but also supported the contractors in the correct use of the post-tensioning systems. The DYWIDAG Post-Tensioning Systems were installed, stressed and grouted by the subcontractor Postenco. Owner Walker Corporation, Australia General Contractor Brookfield Multiplex, Australia Contractor Form 700, Australia Subcontractor Post-Tensioning Works Postenco Pty. Ltd., Australia Architects The Buchan Group and akin creative, both Australia DSI Unit DYWIDAG-Systems International Pty. Ltd., BU Civils, Australia DSI Scope Production, supply, technical support DYWIDAG Products 10 DYWIDAG Strand Tendons with Type 6837 MA Anchorages and eight 57mm Ø DYWIDAG Bar Tendons 45