My first Magazine dsi-info-23-en | Page 144

Construction—North America—USA—Structural Repair Solutions The San Antonio Y Interchange: Permanent Repair with DYWIDAG Systems The San Antonio Y Interchange in the center of San Antonio, Texas, USA, is a Y shaped interchange between US Highway 35 from the northeast and US Highway 10 from the northwest that merge together moving south. The viaducts of this elevated intersection were built in the 1980s utilizing precast concrete segmental type construction. The 755 sections were post-tensioned together using longitudinal and transversal tendons, and the bridge has a total length of approximately 23km (14.3mi). When the interchange was built, it was not yet known how important it is to completely grout the tendons, and at the time industry standards did not place a strong emphasis on this component of the construction. As the grouting operations were not carried out thoroughly, voids often occurred that allowed moisture and oxygen to infiltrate the system, thereby causing corrosion of the post- tensioning strands. During a cursory evaluation of the Y Interchange, the Owner, TXDOT, found voids in some of the tendon ducts. Furthermore, the ducts of many tendons were damaged, and most anchors had no caps, which are important for protecting the strand 144 tails and act as an additional level of corrosion protection. DSI Construction USA was selected as the subcontractor by the Owner and Contractor to perform all of the remediation work associated with this section of the elevated highways. One of the biggest challenges was determining the number of the originally installed tendons that had to be repaired because an in-depth evaluation and survey was not possible in advance. DSI engineered all test inspection and repair protocols as part of their construction plan and carried out the work through the use of bore scopes to identify the condition of the strands within the voided areas. In addition, when DSI identified voids, specialized vacuum grouting techniques were employed to measure the void volumes and then fill the voids with grout. Since the original construction of the Y Interchange was done in several phases and by different contractors, the tendons had also been supplied by several different Post-Tensioning companies, resulting in many different anchorage types. DSI designed, produced and installed custom caps for each type of anchorage.