My first Magazine dsi-info-23-en | Page 143

Construction—North America—USA—Structural Repair Solutions Access was the most challenging component of this repair program and required the utmost attention to detail. DSI provided a total of 4 man baskets for access to the upper boot locations. Each basket was individually controlled with a safety spotter to ensure safe movement up and down the pylon exteriors. The repair work on the Talmadge Bridge was completed safely, on time and on budget in February 2016. Owner Georgia Department of Transportation (GDOT), USA General Contractor TIC – The Industrial Company, USA Subcontractor DYWIDAG-Systems International USA Inc., Structural Repair, USA Consulting Engineers TranSystems Corporation, USA DSI Unit DYWIDAG-Systems International USA Inc., Structural Repair, USA DSI Scope Supply, installation, technical support DYWIDAG Products Anchor cap seals, corrosion inhibiting compound, stay cable pipe tape 143