Construction — EMEA — Egypt — Tanks
Post-Tensioning Silos with DYWIDAG Strand Tendons : The Al Arish Cement Plant in Egypt
Recently , a cement plant was extensively expanded in the northeast of the Sinai Peninsula near the coastal town of Al Arish .
2 raw meal silos , 2 clinker silos and 4 cement silos with a production capacity of 11,000t of cement per day were built in the first project phase between 2009 and 2010 . The Egyptian DSI licensee MISR DYWIDAG participated in the construction of 6 of those silos .
During the second expansion phase in 2015 , 2 raw meal silos , 2 clinker silos and 4 cement silos were built that will increase production capacity by 11,500t of cement per day .
MISR DYWIDAG carried out the posttensioning work on all silos . One raw meal silo , one clinker silo and the 4 cement silos were built together with the contractor Gama for Trading & Contracting S . A . E . The other raw meal silo and the second clinker silo were built in co-operation with the contractor SIAC .
The silos were built using the slipform method . Work was carried out in 2 shifts , with approximately 1m concreted per shift , which roughly equals construction progress of 2m per day .
For post-tensioning the silos , MISR DYWIDAG supplied and installed Type 7-0.60 " DYWIDAG Strand Tendons with a total weight of 435t and 2,840 Type SD Plate Anchorages .
Since MISR DYWIDAG simultaneously worked on 4 silos , a total of 40 technicians and 4 supervisors was on site . The fact that the silos had to be completed with two different contractors within a very limited timeframe posed a special challenge .
Owner Ministry of Defense , Egypt General Contractor Chengdu Design and Research Institute of Building Materials Industry Co ., Ltd ., China Contractor SIAC , Industrial Construction & Engineering Company and Gama for Trading & Contracting S . A . E , both Egypt Consulting Reliance Heavy Industries ( RHI ), Egypt
DSI Licensee MISR DYWIDAG , Egypt MISR DYWIDAG Scope Production , supply , installation , technical support , supervision DYWIDAG Products Type 7-0.60 " DYWIDAG Strand Post- Tensioning System with 2,840 Type SD Plate Anchorages
124
Construction—EMEA—Egypt—Tanks
Post-Tensioning Silos with DYWIDAG Strand Tendons:
The Al Arish Cement Plant in Egypt
Recently, a cement plant was extensively expanded in the northeast of
the Sinai Peninsula near the coastal town of Al Arish.
2 raw meal silos, 2 clinker silos and 4 cement
silos with a production capacity of 11,000t of
cement per day were built in the first project
phase between 2009 and 2010. The Egyptian
DSI licensee MISR DYWIDAG participated in
the construction of 6 of those silos.
During the second expansion phase in 2015,
2 raw meal silos, 2 clinker silos and 4 cement
silos were built that will increase production
capacity by 11,500t of cement per day.
MISR DYWIDAG carried out the post-
tensioning work on all silos. One raw meal silo,
one clinker silo and the 4 cement silos were
built together with the contractor Gama for
Trading & Contracting S.A.E. The other raw
meal silo and the second clinker silo were built
in co-operation with the contractor SIAC.
124
The silos were built using the slipform
method. Work was carried out in 2 shifts,
with approximately 1m concreted per shift,
which roughly equals construction progress
of 2m per day.
For post-tensioning the silos, MISR DYWIDAG
supplied and installed Type 7-0.60" DYWIDAG
Strand Tendons with a total weight of 435t and
2,840 Type SD Plate Anchorages.
Since MISR DYWIDAG simultaneously worked �ۈ
�[��H�[و
X��X�X[��[��0��\\��\�ܜ��\�ۈ�]K�H�X�]B��[��Y��H��\]Y�]��Y��\�[����X�ܜ��][�H�\�H[Z]Y[YY��[YB���YH�X�X[�[[��K���ۙ\��Z[�\��HوY�[��KY�\��[�\�[��X�܂��[��H\�Yۈ[��\�X\���[��]]Hو�Z[[��X]\�X[[�\��H�ˋ��[�B���X�܂��PP�[�\��X[�ۜ��X�[ۈ ��[��[�Y\�[����\[�H[��[XB��܈�Y[�� ���X�[��ːK�K���0�Y�\��ۜ�[[��[X[��HX]�H[�\��Y\�
�JKY�\��HX�[��YB�RTԈU�QQ�Y�\�RTԈU�QQ����B���X�[ۋ�\K[��[][ۋX��X�[��\ܝ�\\��\�[ۂ�U�QQ���X�\H
�L���U�QQ���[���B�[��[ۚ[���\�[H�]�
\H��]H[��ܘY�\