Construction—EMEA—Poland—Tanks
Furthermore, due to the fact that the chamber
walls were erected using sliding formwork
technology, and due to the small amount
of storage space, all of the post-tensioning
systems had to be supplied to the jobsite
just-in-time.
Thanks to the minimal space requirements
of the strand tendons that were supplied by
DSI on coils, the pilasters were realized very
efficiently. Also, the robust post-tensioning
system provided by DSI ensured an easy
installation of the MA Anchorages and
trumpets. The accessories supplied by
DSI – especially the reliable threaded
connections between the PE grout caps
and the anchor plates – ensured that
grouting work proceeded smoothly.
Owner
Enea Wytwarzanie Sp. z o.o.,
Poland
General Contractor
Joint Venture, consisting of
Mitsubishi Hitachi Power Systems
Europe GmbH, Germany and
Polimex-Mostostal S.A., Poland
Contractor
Instal Warszawa S.A., Poland
DSI Unit
DYWIDAG-Systems International
Sp. z o.o., Poland
DSI Scope
Production, supply, installation,
technical support, supervision
DYWIDAG Products
576 Type 6-7 SUSPA Systems Strand Tendons
with 1,152 MA Stressing Anchorages
113