My first Magazine dsi-info-23-en | Page 101

Construction—EMEA—Great Britain—Structural Repair Solutions Additional supporting anchorage points were arranged at mid flange, and at the lower end, termination points served to stabilize the underside cradle. In addition to the fully threaded coarse thread, the advantage of the GEWI ® System was that the threadbars could be bent in the lower bar section. While the old ties were being replaced by the new GEWI ® Tie Rods, DSI stabilized the sewer pipes using temporary tendons. These tendons were equipped with load cells to monitor the load in the sewer barrels. DSI also developed a precise loading sequence to ensure progressive load transfer between the old and the new tie rods. The temporary tie rods resting on the top girder had different vertical inclinations. Consequently, special rocker plates were required to place the load cells in line on each tendon. Owner Thames Water Utilities Limited, Great Britain General Contractor Optimise Joint Venture, consisting of J. Murphy & Sons Ltd., Barhale Construction plc, The Clancy Group plc and MWH Global, Inc., all of them Great Britain Subcontractor (Installation) PC Richardson & Co Ltd., Great Britain Engineering AECOM, Great Britain DSI Unit DYWIDAG-Systems International Ltd., Great Britain DSI Scope Production, supply, technical support DYWIDAG Products 150 28mm Ø GEWI ® Hangers, load cells 101