Construction— EMEA— Germany— Commercial Buildings
For the slabs above the first upper floor and the 1 st, 3 rd and 4 th floor, DSI supplied both oval, Type 6-5, SUSPA Systems Tendons and Type 6-9, SUSPA Systems Post-Tensioning Systems in round ducts.
Both post-tensioning systems were placed horizontally and vertically on the formwork without additional reinforcement. They were supplied complete with Type E Stressing
Anchorages and Type EP Fixed Anchorages and were also tensioned by DSI technicians. A total of 671 prefabricated, Type 6-5, 8- 76m long tendons with a total weight of 146t as well as 364 Type 6-9, 26- 51m long tendons with a total weight of 125t were installed in the 5 aforementioned slabs of the new DesignCenter. In addition to the stressing and fixed anchorages, Types E and EP, 40 Type 6-9 coupling anchors were installed.
Owner Audi AG, Germany General Contractor MAUSS BAU GmbH & Co. KG, Germany Architect gmp Generalplanungsgesellschaft mbH, Germany Engineering( Support Structure Planning) ULM-Ingenieurgesellschaft mbH & Co. KG, Germany
DSI Unit DYWIDAG-Systems International GmbH, BU Post-Tensioning, Germany DSI Scope Production, supply, technical support, tensioning work DYWIDAG Products 671 Type 6-5, 8- 76m long tendons; 364 Type 6-9, 26- 51m long tendons