3 |
Editorial |
|
4 |
Content |
|
6-7 |
Global |
DSI Construction – Always one Step ahead in Technology |
8-9 |
Global |
DSI Underground has never been stronger |
APAC( ASIA / PACIFIC) | |||
12 |
Australia |
Mining |
Special Grout for Rock Consolidation: DSI Australia supplies the Pajingo Gold Mine with DYWI ® Grout |
14 |
Australia |
Mining |
Delivering Ground Support Cost Efficiencies: The DSI-PEAK Resin Bolting System |
16 |
Australia |
Mining |
The Kinloc Bolt: Value Added thanks to Customized Solutions |
18 |
Australia |
Mining |
The OneStep Mining Bolt: A Premium Ground Support Product for individual Requirements |
20 |
India |
Tunneling |
The Rohtang Tunnel: Ground Support Products by DSI Underground for one of the World’ s highest Mountain Passes |
22 |
Austria |
Tunneling |
Major Orders of more than € 46 Million in Tunneling for DSI Underground Austria |
24 |
Austria |
Tunneling |
Short Distances with DSI: Supply of Ground Support Products for the Granitztal Tunnel Chain in Austria |
26 |
Austria |
Tunneling |
Flexible Energy Generation: DSI supplies Ground Support Products for Obervermuntwerk II at a Height of 1,700m |
28 |
France |
Tunneling |
The Tunnel du Chambon: POWER SET Bolts stabilize important Connection between Grenoble and Briançon |
29 |
Germany |
Tunneling |
Construction of the Pforzheim Tunnel: DSI supplies Ground Support Products for the Karlsruhe-Muehlacker Train Section |
30 |
Greece |
Tunneling |
The Klokova Tunnel: Ground Support Products by DSI Underground for Greece’ s new North-South Connection |
32 |
Canada |
Tunneling |
John Hart Generating Station Replacement Project: System Solutions for difficult Ground Conditions in an Access Tunnel |
34 |
Canada |
Mining |
Innovations in Mining: DSI Underground develops efficient Cable Bolt Systems |
36 |
Brazil |
Tunneling |
The Caquende Hydroelectric Power Plant in Brazil: The AT – Pipe Umbrella System demonstrates its Efficiency and Safety |
38 |
Global |
Tunneling |
BULLFLEX ® Support Pillars prove their Load-Bearing Capacity: Successful Tests at the NIOSH Laboratory |
42 |
Australia |
Slope Stabilizations |
DYWIDAG GRP Anchors stabilize Slopes along Coramba Road in New South Wales |
43 |
Australia |
Hydro & Marine Structures |
GEWI ® Tie Rods permit the Use of a 450t Crawler Crane: The BAE Systems Facility in Henderson |
44 |
Australia |
Commercial Buildings |
Light and stable Structures: DYWIDAG Post-Tensioning Tendons for Tower Two at Collins Square in Melbourne |
46 |
Brunei |
Bridges |
DYWIDAG Strand Tendons for flowing Road Traffic: New Viaducts in Brunei |
48 |
India |
Bridges |
DYNA Grip ® Stay Cables for Gujarat’ s first Extradosed Bridge: The 3 rd Narmada Bridge |
50 |
India |
Slope Stabilizations |
The Chenab Bridge: DYWIDAG Systems stabilize impressive Slopes for the World’ s highest Railway Bridge |
52 |
Indonesia |
Bridges |
The Kuningan Flyover in Jakarta: Cantilever Erection for efficient Construction Progress |
53 |
Indonesia |
Bridges |
The Permata Hijau Flyover in Jakarta: Road Safety with DYWIDAG Post-Tensioning Systems |
54 |
Japan |
Bridges |
Efficiency with DYWIDAG Strand Tendons: The Gunkai-gawa Bridge on the New Tomei Expressway in Japan |
56 |
Myanmar |
Bridges |
The Tamwe Flyover: DYWIDAG Post-Tensioning Systems for Yangon’ s longest Viaduct |
57 |
Myanmar |
Commercial Buildings |
The Sule Square Project in Myanmar: DYWIDAG Post-Tensioning Systems for a modern Office Tower |
58 |
Singapore |
Commercial Buildings |
The DUO Project in Singapore: DYWIDAG Post-Tensioning Tendons keep huge cantilevered Building Elements in Balance |
60 |
South Korea |
Slope Stabilizations |
The 2 nd Suburb Beltway in Seoul: DYWIDAG Bar Anchors contribute to Traffic Relief |
61 |
Sri Lanka |
Commercial Buildings |
Spectacular Architecture with DYWIDAG Post-Tensioning Systems: The Clearpoint Residencies Tower in Sri Lanka |
62 |
Vietnam |
Bridges |
The Lach Huyen Bridge: DYWIDAG Strand Post-Tensioning Systems stabilize Vietnam’ s longest Sea Crossing Bridge |
EMEA( EUROPE, MIDDLE EAST, AFRICA) |
64 |
Austria |
Foundations |
The new Eibsee Gondola on the Zugspitze Mountain: DYWIDAG Systems for Germany’ s highest Jobsite |
68 |
Austria |
Slope Stabilizations |
Immediate Measure Ehrenhausen: DYWI ® Drill System permits fast and flexible Slope Stabilization |
70 |
Belgium |
Bridges |
New Pedestrian Bridge in Liège: DYWIDAG Bar Tendons keep 430t Steel Element in Balance |
72 |
Denmark |
Excavations |
Construction of a new Quarter with DYWIDAG Strand Anchors: The Frederiks Plads in Aarhus |
73 |
Finland |
Excavations |
The REDI Complex: DYWIDAG Systems stabilize the Foundation of Finland’ s largest Construction Project |
74 |
France |
Commercial Buildings |
High Quality Products and Technical Support: Construction of a new Children’ s Home with Technique Béton |
75 |
France |
Commercial Buildings |
High Quality Concrete Accessories for modern Complex of Buildings: The“ Côté Jardin” in Guyancourt |
76 |
France |
Commercial Buildings |
The Carré Haussmann: Technique Béton supplies Chemical Products and Spacers for modern Office Block |
77 |
France |
Commercial Buildings |
Chemical Solutions and Accessories for a new Pedestrian Bridge |
78 |
France |
Tanks |
Protection against Floods: Chemical Solutions and Accessories for Water Retention Tanks |
79 |
France |
Commercial Buildings |
Technique Béton supplies Special Products for Europe’ s largest Wastewater Treatment Plant |
80 |
Germany |
Commercial Buildings |
DSI supplies Post-Tensioning Systems for trend-setting Design: Construction of Audi’ s new DesignCenter |
82 |
Germany |
Excavations |
The Karlsruhe City Railway: DYWIDAG Strand Anchors ensure Stability against hydrostatic Ground Water Pressure |
83 |
Germany |
Slope Stabilizations |
GEWI ® Soil Nails ensure long-term Security: Widening of the B14 Federal Road southwest of Stuttgart |