· Estimated fixed overhead: $400,000 · Estimated direct labor hours: 40,000 It is now 12 months later. Actual total overhead incurred in the manufacture of 7,900 units amounted to $895,100. Actual labor hours totaled 39,800. Assuming a direct labor standard of five hours per finished unit, calculate the following: a. Variable overhead efficiency variance b. Fixed overhead volume variance c. Overhead spending variance Chapter 7 Problem 1 1. P26-A1 Basic flexible budgeting (L.O. 2) Centron, Inc., has the following budgeted production costs: Direct materials $0.40 per unit Direct labor 1.80 per unit Variable factory overhead 2.20 per unit Fixed factory overhead