Foundation (2018) Terms
Page: 10 of 27
incident report
Ref: ISO 29119
Synonyms: deviation report, software test incident report, test incident report
Documentation of the occurrence, nature, and status of an incident.
incremental development model
Ref: After PMBOK
See Also: iterative development model
A development lifecycle model in which the project scope is generally determined early in the project lifecycle, but time and cost estimates are routinely
modified as the project team understanding of the product increases. The product is developed through a series of repeated cycles, each delivering an
increment which successively adds to the functionality of the product.
independence of testing
Ref: After DO-178b
Separation of responsibilities, which encourages the accomplishment of objective testing.
informal group review
Ref: ISO 20246
An informal review performed by three or more persons.
informal review
Ref: ISO 20246
A type of review without a formal (documented) procedure.
input
Ref: ISO 24765
Data received by a component or system from an external source.
inspection
Ref: After ISO 20246
A type of formal review to identify issues in a work product, which provides measurement to improve the review process and the software development
process.
installation guide
Supplied instructions on any suitable media, which guides the installer through the installation process. This may be a manual guide, step-by-step
procedure, installation wizard, or any other similar process description.
integration
The process of combining components or systems into larger assemblies.
integration testing
Testing performed to expose defects in the interfaces and in the interactions between integrated components or systems.
interoperability
Ref: After ISO 25010
The degree to which two or more components or systems can exchange information and use the information that has been exchanged.