Medical Journal - Houston April 2013 | Page 5

Medical Journal - Houston Page 5
April 2013
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
150,000 SF MEDICAL / OFFICE DEVELOPMENT NEAR GRAND PARKWAY ON KINGSLAND BLVD .
23510 Kingsland , Phase I of the development , is centrally located on the northwest corner of Kingsland Boulevard and Cobia Drive . The site was selected based on its close proximity to five major hospital systems , great accessibility to Grand Parkway and Interstate 10 as well as its position within a high growth suburban area .
• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
• Excellent location across PHASE I OF CONSTRUCTION from future St . Luke ’ s hospital in Katy , Texas West of Grand Parkway
• Great accessibility to Grand Parkway , I-10 corridor , and Katy Mills Mall
• Close proximity to four major hospital systems ( Memorial Hermann , Methodist , Texas Children ’ s , and Christus St . Catherine )
• LEED , high-performance , class “ A ” buildings designed for the highest standards of indoor air quality , and energy efficiency .
* Current Construction 4.5.2013
FOR LEASING INFORMATION :
TIM GREGORY SENIOR VICE PRESIDENT HEALTHCARE ADVISORY SERVICES TRANSWESTERN 713.272.1242 tim . gregory @ transwestern . net
FOR DEVELOPMENT INFORMATION :
JEFF MICKLER PRESIDENT AND CEO JACOB WHITE DEVELOPMENT 281.286.6666 jmickler @ jacobwhitecc . com
• 40 % to 50 % reduction in total OPEX cost
• State-of-the-art building management system
• Physician Ownership Available
* Rendering of Proposed Development Phase I , Phase II , and Phase III