CROSS-LAMINATED TIMBER & RENOVATIONS
CROSS-LAMINATED TIMBER & RENOVATIONS
CLT & renovation solutions
Whether you’ re working on a CLT structure, concrete slab, or renovation projects, Hilti delivers faster, code-compliant firestopping— without coring or rework, just ready-to-install performance that helps save on labor and supports long-term safety.
Mass timber construction continues to grow for its sustainability, speed, and design appeal— and so do its unique firestopping challenges. Hilti leads the way with tested, proven solutions for vertical risers and remains the only provider offering preformed drop-in devices specifically designed for CLT.
CFS DID Drop-in device
• Only available preformed device for vertical risers on CLT projects.
• Designed to install correctly the first time— saving labor and reducing risk.
• One-step solution for firestopping metal and plastic pipe penetrations.
• Preformed design removes scope for installation errors and rework.
CFS DID in renovation
• Suitable for use in renovation as well as new construction.
• For use in concrete, hollow core, and concrete-over metal deck slab thicknesses from 2-1 / 2” to 12-1 / 2”.
• One-step firestop solution for plastic, metal, and insulated metal pipes through cored or sleeved holes.
• Quick and simple installation— designed to increase your productivity and reduce labor costs.
SHOP NOW UL LISTINGS LEARN MORE
SEE HOW
CFS-DID outperforms other Firestop methods www. hilti. com 10