MARKtoe! April 2026 - Uitgawe 136 | Page 136

PPC CEMENT
PPC CEMENT

6.

Add your hanger: Insert a loop of wire or string at the top before the concrete sets.

7.

Add texture: Roughen the surface using hands or tools. Don’ t overwork it, natural is better.

8.

Let it cure: Leave for 24 – 48 hours. Keep slightly damp to prevent cracking.

9.

Remove the mould: Pop the balloon or remove sand and peel away plastic.

10.

Smooth the edges: Lightly sand sharp edges while keeping the raw look.

11.

Style your space: Hang your nests and style them with succulents, Easter eggs, or both.

136 MARKtoe! April 2026