LUSD Facilities Master Plan | Page 38

Section Three F a c i l i t y Livingston Union School District | Facilities Master Plan A s s e s s m e n t s Yamato Colony Elementary School ID Construction Cost Improvement Building Site and Community Improvements Project Cost 11,066,000 13,689,000 8,471,000 10,479,000 ID Construction Cost Improvement Site Improvements 2,420,000 4-PRKG New Off-Site Bus Parking / Drop-Off Lane, concrete walk and 4-feet tall fencing along edge of walking path. 104,900 1-PRKG "Parking Lot #1 reconfiguration for improved safety and drop off 36 Parking Stalls + 20 Drop Off Stalls. 4-foot tall fencing between walkways and parking lots." 512,900 1,267,800 Building Improvements A-REMOD "Bldg A Remodel 2,900 SF. Reconfigure all Rooms. Larger Accessible Staff Restrooms, Nurse Office Suite, 3 Offices, Conference Room, Teacher Mail Boxes, Larger Entry" TK-REMOD "TK Remodel. Reconfigure interior spaces and increase overall size. TK Room 1,300 SF with Shared Toilets 450 SF" 378,900 2-PRKG "Parking Lot #2 reconfiguration for improved safety and TK-Kindergarten drop off. 25 Parking Stalls next to TK-Kindergarten Gate." 291,400 D-RR Restroom Upgrades. Toilet Partitions, Fixtures, Exhaust Fans, Doors and Hardware, RFP on Walls, Painted Ceiling 655 SF 119,300 3-PRKG "Parking Lot #3 reconfiguration for improved safety and drop off. 74 Parking Stalls + 10 Drop Off Stalls. New off-site drive approach." 104,900 "New Library Building and Site Work. See LIBRARY FLOOR PLAN Detail. Building Area 3,250 SF. Concrete Walks 2,400 SF, Masonry Wall 125 LF See Library Floor Plan" TK-PLAY Play Area for Transitional Kindergarten 210,200 E1-LIB K-COURT Kindergarten Play Court 218,900 K-PLAY Kindergarten Play Area 121,700 M1-Portables "Replace Existing Portable Buildings with Classrooms 30' x 30' with Sinks & Casework, 4,300 SF. Concrete Walks 2,300 SF Option 1: Modular Buildings. Option 2: Permanent Buildings" 1,092,900 K-FENCE Remove and replace chain link fence. Powder Coated Black 1-PLAY 1st Grade Play Structure, Surfacing, Storm Drainage & Fabric Shade Structure 149,000 "Replace Existing Portable Buildings with Classrooms 28' x 37' with Sinks & Casework, 9,300 SF. Concrete Walks 5,300 SF Option 1: Modular Buildings. Option 2: Permanent Buildings" 1-SHADE Metal Shade Structure & Concrete Pad with seating 139,900 1,967,200 2-PLAY Replace Play Structure, Replace Surfacing, Add Storm Drainage & Fabric Shade Structure 149,000 3-PLAY Relocated Play Area. New Surfacing and Equipment 125,300 3-SHADE Metal Shade Structure & Concrete Pad with seating 139,900 D.F Remove and replace drinking fountains with Filtered Water Fountains at 7locations. Accessible Hi-Low Drinking Fountains, Hot-Dipped Galvanized Cane Rails and Concrete Patch 35,700 FENCE-W "Ornamental Iron Fence and Concrete Mow Strip, 6-Feet Tall, 2 Accessible Gates, 2 Maintenance Gates (15')" 41,400 FENCE-N "Chain Link Fence (Powder Coasted Black) with Concrete Mow Strip, 6-Feet Tall and 1 Accessible Gate" 49,000 M2 2,036,400 ROOFING "Remove and Replace Roofing. Single Ply PVC over 2"" Rigid Insulation Board. Replace Plywood Deck, 5% of area. Buildings A, B, C & D" 986,200 DOORS Remove and replace exterior hollow metal doors and hardware, 20 locations 43,700 SIGNS "Add Accessible Room ID Signs, Add Accessible Toilet Room Signs. Campus Wide." 10,200 FANS Remove and Replace all exhaust fans in toilet rooms. 10 locations. 14,600 HVAC "Remove and Replace HVAC Equipment & Equipment Curbs. Campus Wide." TECH-SC "Technology, Structured Cabling. Replace the Structured Cabling system between the school site Main Distribution Frame and the utility service provider. Quantity: Fiber Optic Cables 12-MMC / 12-SMC, and a 25 Pair twisted cable copper backbone" 36,400 TECH-HC "Technology, Horizontal Cabling Replace the Horizontal Cabling system between the Intermediate Distribution Frame and the data drops. Cat-6e cable at 1-1/4"" pathway, or Cat-6 if pathway is 3/4" ".Quantity: 40% of the campus, or 5 Drops per Classroom." 109,300 TECH-IDF "Technology, IDF Room Cooling. Install a cooling system at the technology IDF cabinet locations. Provide dedicated electrical power circuits and a battery back-up UPS system. Quantity: 4 locations at each school site. " 21,900 VIDEO "Provide a Video Surveillance system at the campus. Two (2) Cameras for each permanent buildings. No cameras at portables." 29,100 P.A. "Add new Public Address system. Speakers in all Classrooms and occupied spaces. 8 Exterior Horns" 109,300 F.A. "Replace Existing Fire Alarm System, District Standard - Gamewell FCI" 145,700 102,000 Project Cost 2,994,000 26,200 36