LJSmithInstallation | Page 11

� �
22 TRIM THE EASING
24 ASSEMBLE THE INTERMEDIATE LANDING FITTING TO THE SECOND FLIGHT HANDRAIL
Trim Here
Rise
Rake
Run
1 1 / 2 "
5 / 16 " 3-1 / 2 " Lag Bolt
Trim the easing along the cut line using a miter saw .
GO TO 23
Use the Rail Marking Template to mark the handrail . Drill a 1 / 4 " x 1-1 / 2 " deep pilot hole in the handrail .
Assemble the intermediate landing fitting to the handrail with a 5 / 16 " x 3-1 / 2 " lag bolt and washer . The LJ-3044 VersaTool may simplify this task .
GO TO 25
23 ASSEMBLE THE EASING TO THE INTERMEDIATE LANDING FITTING
25 ASSEMBLE THE RAIL DROP TO THE INTERMEDIATE LANDING FITTING
Nut
5 / 16 " x 2 " Lag Bolt
5 / 16 " x 2 1 / 4 " Machine Bolt
Use a 5 / 16 " x 2 1 / 4 " machine bolt and nut to assemble the single pocket end of the easing to the intermediate landing fitting . Use a 3 / 8 " SAE washer on the bolt head end , and a 3 / 8 " SAE washer with a 5 / 16 " lock washer on the nut end . The LJ-3044 VersaTool may simplify this task .
Page 21
GO TO 24
Assemble the rail drop to the intermediate landing fitting with a 5 / 16 " x 2 " lag bolt and washer .
GO TO 26
Page 22