2 . Mount the Level Stop Newel on the level run centerline at the end of the level run by threading the newel hanger bolt into the steel insert on the tread ( H ). Placing wax paper under the newel may help prevent marring the tread as the newel is tightened down . Trim away the excess wax paper once the position of the newel is permanently set . |
H |
Newel
Hanger Bolt
|
Landing Tread
Steel Insert
|
3 . Mount a Level Corner Newel at each level run corner in the same manner as 2 . above ( H ). |
I |
WALL |
Level Start / Stop Newel |
4 . The distance between the newels should not exceed 48 ". If the distance is greater than 48 ", a Level Center Newel must be installed at 48 " maximum intervals between the installed Level Newels . Mount each Level Pass Through Newel on the centerline ( I ). |
Rake Down Newel |
48 " Maximum |
Level Center Newel |
48 " Maximum |
48 " Maximum |
Centerline |
Level Corner Newel |
Install the Handrail onto the Newels : |
1 . Drill a hole 25 / 32 " x 1 " deep centered on the top of each newel to accept the provided 2 " x 3 / 4 " wooden dowel ( J ). |
Drill 1 " Deep Hole |
||||
2 . Using construction adhesive , install the wooden dowel into the hole on the top of each newel . |
Rake Newel |
J |
Level Newel |
||
3 . Trim the 684 handrail to length for each run . Utilize handrail fittings for making turns or changes in elevation ( if desired ). |
4 . Drill the bottom of the handrail to accept the wooden dowel previously installed in each newel ( J ). |
1½ " Screw |
1½ " Screw |
|
5 . Using construction adhesive , place the handrail onto the newel dowels . Secure the handrail in place by installing 1½ " screws through the newels into the handrail bottom . Plug the holes ( K ). |
2 " x 3 / 4 " Wooden Dowel
K
|
||
Install the Tube Infill :
1 . The fatory pre-bored holes in the newels are 3 / 4 " deep . In order to install the stainless tube , the holes in one newel of each opening must be drilled deeper to 1 1 / 2 " ( L ). We recommend using a 3 / 4 " Forstner bit making sure the hole shape and size on the surface of the newel is not altered in any way as the the hole is bored deeper .
|
L |
Bore the newel holes deeper on only one side of the opening
Factory Bored to 3 / 4 "
|
Bore hole deeper to 1 1 / 2 " |
2 . Measure the opening between the newels and add 1 1 / 2 ". |
M |
Add 1 1 / 2 " to this measurement |
|
3 . Transfer that measurement to the tube . Mark and cut the tube using a hack saw ( M ). |
Mark and trim here |
||
4 . Place adhesive deep into the bored hole in each newel of the opening . Slide the tube all the way into the deepest hole being sure to make contact with the adhesive ( N ). Then line up the opposite end of the tube to the corresponding hole in the newel at the other end of the opening and slide the tube all the way into the hole ( O ). |
N
O
|
Slide tube all the way into deepest hole
Slide tube all the way into opposite hole
|