Once finalised, the site plans helped develop general and safeguarding risk assessments, identifying potential hazards and control methods (Health and Safety Executive, n.d.; Tarlow, 2002). These were submitted to British Triathlon who helped to design the transition area and permitted the event, raising its profile (British Triathlon, 2017).