Lithocrete Book - Volume 1 | Page 57

56 Finished wall with System 10 - Presto Wall Finish. It was the decision of 2049 Century Park East’s building’s owner, Tramell Crow Company, to remove the existing travertine and the paving of the auto court drop-off and replace it with the Ascona Lithocrete® to match the new building. Due to weight restrictions on the three existing decks, up to 9 feet of high load 40, 2.4 lbs. styrofoam was used over a slurry setting foundation over Mira drain over the waterproofed structural deck. Conical-shaped wall. Inside formwork prior to the installation of reinforcing steel. Lithocrete_book_trademark_edited.indd 56 1/2/2008 8:25:14 AM