LakeTalk August 2023 | Page 30

List of All Current LLA Projects

The attached list can be found in the main page of the Condo Control Library ( not within a folder ) and will be updated monthly with the location , start / completion dates , and brief description . Please also look for these projects as topics for discussion on Board of Director and Work Session agendas ( shared in the Friday Flyer ).
Project Type
Location
Projected Start
Projected Completions
Brief Description
Tree Replacements common areas throughout fall 2023 fall 2023 trees to replace invasives being removed Cherry Tree Replacement WW Entrance October 2023 November 2023 Phase 1 of tree replacement ; currently with WW Committee Shrub Replacement WW Entrance October 2023 November 2023 Replacement of any dead or dying landscape Cabana Siding Coldstream Pool October 2023 November 203 Replacement of old wooded siding Retaining Wall Replacement Coldstream Beach November 2023 Dec . 2023 Replacement of retaining wall below parking lot Bench & Picnic Table Replacement Community Wide May 2023 Completed replace old picnic tables Cluster Mailbox Replacement Community Wide August 2023 Sept 2023 replacement of old boxes in disrepair with new style Esplanade Repairs To broken sections of esplandade ongoing Dec . 2023 Finalizing RFP to obtain bids by August 31 , 2023 Beach Sand Replenishment Both Beaches April 2023 Completed addition of fresh sand Playground Equipment Replacement Multiple Tot Lots May 2023 August 2023 Various minor repairs needed throughout community - repair completed / replacement out for bid Lakeridge Rd Alignment Lakeridge Rd . Pinehurst March 2023 Completed realignment of roadway to correct grade issues Road Repairs Pinehurst Behind Forest Edge Cl April 2023 Completed Repair and topcoat Ridgecrest Rd Oakdale Bathhouse Painting Oakdale Pool April 2023 Completed interior painting of walls and doors Digital Pool Guest Passes Condo Control May 2023 April 2024 Pet Waste Stations Oakdale and Hamptons April 2023 October 2023 new pet waste station installation New Boat Racks Pinehurst Behind Forest Edge Cl Nov / Dec 2023 Dec . 2023 build new boat rack ( s ) adjacent to Lake Linganore New Signs / Lights West Winds Fall / Winter 2023Fall / Winter 2023 Install new lights / signs to match existing
software buildout to enable members to purchase blocks of guest passes and use them digitally at the pools
Lakes Study All 4 Lakes ongoing Phase 1 Complete study of health of all 4 lakes and plan to remediate Lake Aeration System Lake Anita Louise March 2023 Completed installation of aeration system and electric service Community Center Design Barn / Tent Lot Spring 2023 February 2024 Development of design for a new community center based on Member feedback Kayak Slot Dock Pinehurst Behind Forest Edge Cl Nov / Dec 2023 Dec . 2023 installation of new slot dock Entrance Signs Coldstream Office March 2023 Completed replacement of outdated signs to complete update of sign design Summerfield Bathhouse Updates Summefield Pool April 2023 Completed Minor cosmetic upgrades : painting & guard countertop Boat Rack Rebuilds Nightingale Beach January 2024 January 2024 rebuild existing boat racks at Nightingale beach to new style
Basketball Parking Area Pinehurst- Lakeview Ct October 2023 November 2023 Build a pull of parking area near the clusterboxes to allow parking for basketball court use Trail Improvements Coldstream June 2023 Completed Re-gravel path from Peddicord Path to Boyers Mill Bridge Pump Track Coldstream or Pinehurst On Hold Installation of new pump track for bikes , skateboads , rollerskates / blade , etc . Pump Shed Coldstream Pool October 2023 November 2023 Build new pump shed near the baby pool Road Paving North Shore Square October 2023 Dec . 2023 Mill and replace all of North Shore Sq Stormwater Infrastructure ReplacementCommunity Wide March 2023 March 2024 Accipiter drainbox done ; Twin Lake drainage ; Lake Merle inflow erosion control Audubon North Sign Entrance Monument June 2023 Sept 2023 Replacement of entrance sign to match community style Eaglehead Bridge Rebuild Bridge Across Dam Summer 2022 December 2024 Rebuild bridge across the Brosius Dam Trail Tree Cleanup Lake Trail July 2023 August 2023 Trim trees along lake trail and remove new and old tree debris