SPORTS PARK
GUGULETHU
Galvanised steel
ventilation louvres
bolted to GMS
angle frame
75mm 'isoterm' insulation
laid horizontally between
channels pressed against
the steel sheeting with wire
mesh to reduce
condensation
Galvanised steel plate
cold formed gutter
60 x 30 GMS
rectangular
section welded to
top chord of truss
25 mm sound proofing
boards screw fixed onto
50 x35 wooden batten
110 x 75mm cold formed
lipped channel bolted to
angle fixing bracket on 80
x 80 GMS angle
Galvanised steel
ventilation louvres bolted
to GMS angle frame
8
120 equal legged
channel bolted to metal
plated welded to 200 x
200 GMS H column
5mm galvanised steel
flashing with drip
12mm laminated low E
glazing
GMS window frame
75 x 50mm timber
batten screw fixed to
fixing bracket to 500 x
200 mm GMS I beam
200 x 75mm cold formed
lipped channel bolted to
angle fixing bracket on
200x200 GMS H column
50 x 38mm timber
batten screw fixed to
fixing bracket to 60 x 30
GMS rectangular section
Skylight Detail
25 mm sound proofing
boards screw fixed onto 50
x 74 batten 600cc
200 x 200 H beam bolted
to 200x 200 GMS H column
and 500 x 200 I column
0.8 mm Aluminium "Craft Lock"
Sheeting to cold formed lipped
channelat 1500cc
Mentis grating fixed to
70mm GMS equal leg
angle bolted onto 90 x
50 GMS C - channel
Roof / Plinth Plan
12mm perforated metal
plate bolted on 100 x 50
GMS C channel
Skin Detail
Main Elevation
Section through Gym and Dance Studio
Kurvin Virahsawmy
Architecture Portfolio 2014