DFT laserlink
case study
KMH Group engineers were able to test the laser heads, prove them all effective and install them in the new premises before they were occupied.
KMH Group technicians then installed similar laser equipment on the roof of the existing premises and linked it to the operational leased line. The
Luke Wooley recalled. “The speed with which the KMH Group turned this project around was truly impressive. The system was fully operative within
eight days of my first contact with them and frankly we couldn’t have achieved a better result than that.”
Email: [email protected]
Web: www.kmhgroup.com
Phone: 0870 777 4564
Fax: 0870 777 5564
KMH Communications Ltd
9 Britannia Business Park
Quarry Wood Industrial Estate
Aylesford
Maidstone
Kent
ME20 7NT