case study
FE15 cabinets. The installation was
managed and conducted by Delta
and Visual Technology using a frame
supplied by Btech and delivered the
required precision, with components
preconfigured at the factory, thus
saving a lot of time during final
assembly. The main components of the
two frames were assembled on-site
before they were then fixed to the
wall with heavy-duty screws to ensure
that they were flush with the cabinet
walls. A requirement of Hanover Rück
was that the video walls and cabinets
looked harmoniously connected.
It was the first time that Roland Fis-
cher had installed a video wall solution
from Delta, and it was also the first
time that the LED cabinets were used
in conjunction with a standard frame
substructure. But everything fitted
together seamlessly and operated and
functioned smoothly. The duration
of the project was only five weeks,
from the commission to installation,
and the calibration of the video walls
was undertaken at night, as it had to
take place under uniform brightness
conditions that couldn’t be guaranteed
during the day. n