Key Biscayne Master Plan 043944000.18w_Key_Biscayne_MP(forJooMag) | Page 113

Chapter 11 OV E RALL PR OG R A M OP IN IO N O F S C HE D U L E Based on the Phasing and Sequencing Plan described in Section 6 of this master plan, a more detailed opinion of schedule was developed to better understand how each individual phase would interact with each other during the implementation process. To develop an opinion of schedule to this level of detail at this stage of the planning process, we primarily used our current relevant experience and lessons learned with this type of construction activity. In addition, schedule considerations were developed through discussions with the Village, area contractors with expertise in undergrounding, and the utility owners. These schedule considerations can be categorized into Design Phase Schedule Considerations and Construction Phase Schedule Considerations. Design Phase Schedule Considerations  Survey and utility base mapping must occur prior to the utility owners beginning their design efforts  AT&T and Comcast require the FPL design to be complete prior to beginning their design efforts  FPL Binding Cost Estimates and Utility Agreements are generally produced within three to four months after Village acceptance of the conceptual FPL design and sufficient progress on the easement acquisition process recognizing the various modifications to the design that are made during this process  CMAR procurement should occur after the completion of the FPL concept design but before completion of the final bid documents to take advantage of constructability review comments and value engineering suggestions  Easement acquisition is desired to begin as early as possible and be completed prior to the start of construction. Eminent domain processes are not considered in this schedule. All easements are assumed to be granted to the Village without compensation.  Any required permits are desired to be secured prior to the start of construction  Any Village infrastructure work that is to be designed and constructed within an undergrounding phase area is to be included in the bid package for that undergrounding phase area 109