Updates & Improvements
Connectivity Boost
In Spring 2022 , IT upgraded the network system throughout the library building in order to improve the Internet connectivity .
New cables were brought to replace the old ones , and more routers were introduced to various locations , including the patio area outside the building -- great news for those who enjoy getting some sun while they study !
David McAllister and Jill McManus , moving books .
Increasing Accessibility
If you often spend time working and studying in the library mezzanine , you have probably noticed recently that all of the bookshelves on that floor are empty . Not to worry — the library isn ' t getting rid of books ! They now have a new home on the first floor , thanks to the efforts of every single member of the library staff and one very hard-working dumbwaiter ( pictured above ).
The series of upgrades has greatly enhanced the wireless capability for both Keiss Library and the Student Success Center to better support our users .
Why move the entire print collection to the first floor ? The mezzanine area can only be reached by stairs , previously making it difficult for anyone with a physical disability to browse the entire collection . We hope to increase accessibility for the entire GMercyU community with this change . In addition , we plan to use the cleared area to address students ' need for additional study space .
9 Updates & Improvements