Keesler JLUS Background Report keesler_background_report | Page 25

Public Outreach Materials Participants at Public Meeting #1 in the City of Biloxi conducted   August 26, 2016      Public Workshop #2 (April 19, 2017 and April 20, 2017).  The second set  of public workshops provided an update of the JLUS project and the  Keesler AFB military mission footprint was reviewed.  Attendees  participated in an active exercise to identify the importance of each  compatibility issues by placing dots next to issues on wall mounted  sheets. The issues identified to date reflected input received from the  Policy Committee, Advisory Committee, Technical Committee,  stakeholder interviews, and public input from the first set of public  workshops. The results of the issues exercise were compiled.  Public  Workshop #2 in Biloxi was held in conjunction with the City of Biloxi  Planning Commission meeting.    Public Workshop #3 (August 2, 2017 and August 3, 2017).  The third set  of public workshops presented the JLUS findings and draft  recommendations to the public. The workshop consisted of a formal  presentation detailing the findings and recommendations followed by a  Question and Answer session for the attendees to provide input on the  draft recommendations.  Background Report  JLUS Fact Sheet / Compatibility  Factors Brochure.  At the beginning  of the JLUS project, a Fact Sheet,  or JLUS Update, was developed  describing the JLUS program,  objectives, methods for the public  to provide input into the process,  overview of the 25 compatibility  factors that were analyzed  throughout the project, and the  proposed Keesler AFB JLUS Study  Area.  This Fact Sheet was made  available at the workshops for  review by interested members of  the public and posted on the  website for download.  These Fact Sheets served as an  Fact Sheet #1 – JLUS Project Overview /  informational brochure describing  Compatibility Factors   each compatibility factor  considered for JLUS development.  While not every factor may apply to the  Keesler AFB JLUS, this list provided an effective tool to conduct a  comprehensive evaluation of compatibility factors within the study area.   Strategy Tools Brochure.  JLUS strategies incorporate a variety of actions that  local governments, military installations, agencies, and other stakeholders can  take to promote compatible land use planning.  This brochure provided an  overview of strategy types that can be applied to address study area  compatibility issues.     Page 1‐7