6.4
How to Read the Implementation Plan
The strategies are designed to address the issues identified during
preparation of the JLUS. The purpose of each strategy is to:
eliminate or reduce the adversity of existing compatibility issues
where possible;
avoid future actions, operations, or approvals that would cause a
compatibility issue; and
provide for enhanced and on‐going communications and
collaboration.
The strategies are presented in a table format in Table 2, providing the
strategy and information on when and how that strategy will be
implemented. They are arranged by compatibility factor. The issue within
each factor is presented first to provide a linkage between the strategy and
the condition it is intended to resolve or minimize. Figure 31 highlights the
format and content of the strategy table. The following paragraphs provide
an overview of how to read the information presented for each strategy in
the table.
Seymour Johnson AFB MCAOD – Military Compatibility Area Overlay
District (a composite of all MCAs for the Seymour Johnson AFB JLUS
Study Area)
Seymour Johnson AFB MCA – Military Compatibility Area
(Coordination, Noise, Safety, BASH or Imaginary Surface)
DCR MIA – Military Influence Area (a composite of all MAAs for the
DCR JLUS Study Area)
DCR MAA – Military Awareness Area (Coordination, Noise, or Vertical
Obstruction)
Strategy. In bold type is a title that describes the strategy. This is followed
by the complete strategy statement that describes the recommended
action.
Timeframe. This column indicates the projected timeframe of each strategy.
The timeframes describe the year in which a strategy will be initiated or if it
is an on‐going action.
Short‐Term
Mid‐Term
Long‐Term
On‐Going
Issue or Strategy #. The issue # and strategy # are unique alpha‐numeric
numbers that provide a reference for each specific issue and strategy. A
strategy’s reference number is composed of the Compatibility Issue number
and this ID (e.g., COM‐1, COM‐1B, etc.).
Geographic Area. This column indicates the geographic area applicable to
the strategy as it relates to the Seymour Johnson AFB and DCR JLUS Study
Areas. Geographic areas consist of the following:
Strategy proposed for initiation in 2017 / 2018
(within year of JLUS completion)
Strategy proposed to be initiated in 2019 / 2020
(within 1‐2 years of JLUS completion)
Strategy proposed to be initiated in 2021/ 2023
(3 to 5 years from JLUS completion)
An on‐going implementation action
Page 72
Seymour Johnson AFB and Dare County Range JLUS Report