Javea Grapevine 336 | Page 15

It is a plan that reduces by more than 7,000,000 m², the area permitted for construction. The Plan concentrates new construction only in consolidated urban plots (without consuming any more land) and recognizes the expected slowdown in the forecast of population increase in the coming years. Moreover, because it is a document so relevant to the future of our Town, we wanted it to be as transparent as possible, with maximum public participation and maximum consensus. The Law stipulates that it must be on public display for 45 days, but we have had it displayed to the public for 90 days.