Intelligent CXO Issue 09 | Page 38

INDUSTRY UNLOCKED
IF THE CONSTRUCTION PROJECT INVOLVES THE DELIVERY OF A TOLL ROAD OR TUNNEL , THEN INFRASTRUCTURE TO CONNECT TO REMOTE TOLL BOOTHS , OR PROVIDE NEUTRAL HOST INFRASTRUCTURE FOR MOBILE OPERATORS NEED TO BE CONSIDERED .
burden is diminished of staff having to return to main office locations to download and print construction or design documents . Not only can staff save valuable time to continue with the task at hand but they can also track site assets accurately .
This includes personnel , plant and surveying equipment that brings added safety , site security and provides an overall view for control teams .
With a network that offers low latency and high bandwidth , high-quality video capture can help introduce remotely operated plant and machinery . Advanced video streaming and analysis use cases can also be unlocked and the wider design and construction team can remain updated with the project progress from a single source . A live feed of as-built surveys can be streamed directly to Building Information Modelling ( BIM ) systems and shared with local or remote offices around the world as the construction site develops .
Furthermore , live data can be streamed to those wearing Augmented Reality headsets on site to show them what the site will eventually look like as the project unfolds . If design or specification changes are required , then remote visual assistance can offer the opportunity to bring together experts remotely to review and agree on them .
Rapidly deployed with reduced complexity
Being able to operate in the most demanding locations , a 5G private network solution can
38 www . intelligentcxo . com