Ingenieur Vol.82 April-June2020 | Page 26

INGENIEUR REFERENCE Banias, G., Achillas, C., Vlachokostas, C., Moussiopoulos, N., & Papaioannou, I. (2011). A web-based Decision Support System for the optimal management of construction and demolition waste. Waste Management, 31(12), 2497-2502. Begum, R. A., Siwar, C., Pereira, J. J., & Jaafar, A. H. (2006). A benefit–cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resources, conservation and recycling, 48(1), 86-98. Gavilan, R. M., & Bernold, L. E. (1994). Source evaluation of solid waste in building construction. Journal of construction engineering and management, 120(3), 536-552. Hu, Y. (2011, May). Minimization management of construction waste. In 2011 International Symposium on Water Resource and Environmental Protection (Vol. 4, pp. 2769-2772). IEEE. Liong, C. K., & Ali, A. S. (2016). Managing waste in refurbishment projects in Klang Valley. Journal of Building Performance, 7(1). Luangcharoenrat, C., Intrachooto, S., Peansupap, V., & Sutthinarakorn, W. (2019). Factors influencing construction waste generation in building construction: Thailand’s perspective. Sustainability, 11(13), 3638. Osmani, M., Glass, J., & Price, A. (2006, May). Architect and contractor attitudes to waste minimisation. In Proceedings of the Institution of Civil Engineers-Waste and Resource Management (Vol. 159, No. 2, pp. 65-72). Thomas Telford Ltd. Tam, V. W. (2008). On the effectiveness in implementing a waste-management-plan method in construction. Waste Management, 28(6), 1072- 1080. 24 VOL 82 APRIL-JUNE 2020