APPENDIX
Tabular Representation Of Previous And Current Regimes
Sr.
Subject
CFO
CCC
i. Effective date Replaced by CCC - redundant 12th April 2007
ii. Applicability The CFO system continues to apply
where:
a) work of ere c tion has not
commenced within 12 months
from date on which plans and
specifications of building were
approved; if work commenced
on or af ter April 12, 2007
(Commencement Date),
b) work suspended immediately
before coming into operation of
Act and is to resume on or after
Commencement Date; and
c) erection of building without
approval of plans and
specifications by the LA under
the Act immediately before
Commencement Date provided
that an application for approval is
made to the local authorities on or
after Commencement Date and the
application is approved.
Under CFO homebuyers used
to receive the house keys (upon
submission of Form E) but could not
move into the houses because the
CFO had not been issued.
The Qualified Person had a statutory
duty and responsibility to supervise
the erection of the building to ensure
that the erection was in conformance
with the approved conditions under
SBDA and the by-laws and that all
technical conditions that had been
imposed by the local authority had
been duly complied with and that
the building was safe and fit for
occupation. CCC can only be issued for projects
that have obtained their Building
Plan approvals after 12th April 2007.
There are six essential services for the
issuance of CCC:
iii. Vacant
Possession
iv. Effective
change in
responsibilities
● ●
● ●
● ●
● ●
● ●
● ●
Confirmation of electrical supply
(TNB)
Confirmation of water supply (water
authorities)
Confirmation of connection to a
sewerage treatment plant or mains
supply (JPP)
Clearance from lifts and machinery
department, if applicable (JKKP)
Clearances for active firefighting
systems except for residential
buildings not more than 18m high)
(Bomba)
Roads & Drainage
The CCC system ensures that Vacant
Possession (VP) can be issued together
with CCC.
The PSP has two-pronged duties – i) to
employer to ensure that the contractor
has executed the works in compliance
with the particular building contract ; ii)
he has to ensure that all the prescribed
Forms G1 to G21 in respect of stage
certifications have been duly certified
by the respective parties and received
by him. Upon issuance of the CCC, the
PSP accepts full responsibility for the
issuance of the said certificate and he
certifies that the building is safe and fit
for occupation
The PSP also has added responsibilities
as compared to the Qualified person
under the CFO regime.
69