Ingenieur Vol 76 ingenieur 2018 October | Page 68

Due to the tight configuration layout of the tank farm, access was limited for firefighters to effectively provide cooling by directing water and foam to affected areas . The layout also advanced heat radiation from one tank to cause fire to multiple tanks. Below is the INGENIEUR recommended bund specification to be put in place: Figure 2: Proposed individual bund configuration for flammable liquid storage tanks. Tanks lined Figure 2: Proposed individual bund configuration for flammable liquid storage tanks. Tanks straight is a better layout as this minimises heat exposure to multiple tanks and allows for better lined straight is a better layout as this minimises heat exposure to multiple tanks and allows emergency response coverage as opposed to configuration in Photo 1. for better emergency response coverage as opposed to configuration in Photo 1. deluge system for a period of at least 20 minutes, necessitating interim bund integrity assessments. Material: Bund floor and walls shall be built of materials impervious to the contents of any or to 133% of the capacity of the largest tank, One of the signs of bund failure is when there tank within the bund. It shall be of sufficient strength and structural integrity to ensure that whichever is greater (2). Generally, bund walls is no water collected after heavy rainfall. It it is unlikely to burst or leak within ordinary use (0). In the particular case of bulk storage of is recommended to have an inspection every should not exceed 1.5 m in height (6) so that: ● ● flammable liquids, bunds shall have fire resistant integrity. The objective is to three structural years (6), or whenever there is an accident Fire-fighting operations are not hindered. ● ● Egress from a bunded area in event of an impacting the structure of the bund. retain the integrity of a bunded area as long as possible in the event of a fire. Concrete and There is no hard and fast rule over the method emergency is relatively easy clay are inherently fire resistant, but the risk of a loss of integrity exists due to joints and ● ● Natural ventilation of the bunded area is statement for bund integrity assessment. Visual penetrations to the bund walls and floors, and the way these features are sealed (0). inspection looks into signs of damage at the inner encouraged For the purpose of bulk storage of flammable and outer wall, including bund base and joints. liquids, it is recommended for each tank to have Hydrostatic testing is filling and holding the bund individual bunds separate from other tanks as any 4 with water up to a level that corresponds with the design capacity of the bund. potential leak may result in pool fire. Note that hydrostatic testing may not be Pipeworks: All pipework shall go over the bund walls, as far as reasonably practicable, otherwise appropriate for reasons such as: ● ● it shall be with adequate sealing and support Tank stability compromised (Tanks may try such that the penetrations are liquid tight and fire to float and may become unstable) ● ● resistant (3). All valves, filters, sight gauges, vent Corrosion of tank base. ● ● pipes and other ancillary equipment should be Flooding of electrical equipment within situated within the bund area and arranged such bund ● ● that leaks and discharges are contained within the Excessive amount of water usage bund area (2). Distance: A good design must take into consideration the distance between tanks. A Active Fire Protection safe distance is when radiant heat from adjacent tank fire is low enough that the adjacent tank In any fire tank incident, a deluge system is can withstand the radiance for certain amount of essential because the application of water time. This will give a time window for emergency spray/deluge onto storage tanks & vessels and response reaction to the incident and minimise structural steel provides effective cooling of damage. exposed surfaces, minimising collateral damage. The distance between tanks is also important Water requirement shall be calculated to cater for to include access for emergency response teams simultaneous deluge activation of the tank on fire because otherwise it would be a futile exercise and additional tanks adjacent to it, as adjacent to extinguish the fire due to the limited range of tanks also require cooling during a fire incident. fire water/foam. Width of access must allow a fire Specific attention must be given to the rim seal truck to easily manoeuvre around the storage tank fires on floating roof tanks scenario (open top and and propel fire water/foam to the exact location covered floating roof). This is mentioned in typical and minimise consequences. design standards and codes used in industry Integrity: Bunds may deteriorate or suffer such as National Fire Protection Association damage during the lifetime of its operation, (NFPA 11)(5). However, incidents have occurred 6 66 VOL 2018 VOL 76 55 OCTOBER-DECEMBER JUNE 2013