INGENIEUR
INGENIEUR
Diagram 3: Overall Sabah-Sarawak Gas Pipeline( SSGP) 36” x 513 km Schematic
FROM SOGT
!
!!
LAUNCHER ESDV
HV2621-22
2623 KIMANIS METERING STATION
HV2620
KP00
BV118 BV117 BV116 K421 KP400 KP373
BINTULU COMPRESSOR STATION BV121 KP481
AG
UG
UG
AG
Dalak Tie-in KP71
BV101 BV102 BV103 BV104 BV105 KP15 KP39 KP61 KP83 KP106
BV115
LAUNCHER
KP343
RECEIVER
SAMUR Tie-in KP91
HV2923
HV2921 LONG-LAMASCRAPPER STATION
HV2703
AG UG
HV2912
UG
AG
KP503
BV106
RECEIVER
KP122
LAUNCHER
LAWAS SCRAPPER STATION
HV2911
BV107 KP143
BV108 K166
BV109 KP193
BV114 |
BV113 |
BV112 |
BV111 BV110 |
KP321 |
KP299 |
KP274 |
KP245
KP217
|
DRY GAS DIVERTER
MANIFOLD GMS-A( MLNG-2)
RECEIVER LAUNCHER
HV2950
HV2954 GTC # 1 GTC # 2 GTC # 3 GTC # 4
UG
AG
BV122 KP495
RECEIVER
HV2701-2
HV2755 BINTULU METERING STATION
SDV410 KP513
GMS-B( MLNG-3)
SSGP Pipeline having: 1 Launcher at KMS, 3 Scrapper Station, 1 Compressor Station, 1 Receiver at BMS( totally 4 piggable section), Metering Station at KP0 and KP503, 19 Valve Station
Open
Diagram 3: SSGP Schematic
Diagram 4: SSGP Elevation Profile
Eleva1on( m)
Pipeline Properties
NPS Pipeline roughness Heat Transfer C oefficient Underground soil temperature MAO P Pipeline wall thickness:-First 100km and last 50km- Remainder of pipeline
Value |
Unit |
36 |
Inches |
0.0006 |
Inches |
3.0 2 |
W / m 2. C |
25 |
C |
96 |
barg |
Distance( km)
Diagram 4: SSGP Elevation Profile
44 VOL 73 JANUARY-MARCH 2018