Energy Saving Measures
The recommended energy saving measures, ‘with
cost’ and ‘without cost’, are in the two tables below.
The BEI readings of Ministry of Works Complex
has decreased since the year 2016 after the cost
saving measures were made during the year. In
2017, some cost saving proposals are being made
including the electrical scope of items 1 to 3 and
the mechanical scope of items 1 to 3. Provision
of these retrofit works has been funded by the
Ministry of Energy, Green Technology and Water
(KeTTHA) at a cost of RM5.86 million.
1) ENERGY SAVING MEASURES WITHOUT COST
No.
RECOMMENDED
ESTIMATED YEARLY ESTIMATED ANNUAL
ENERGY MEASURES
SAVING (kWh)
SAVINGS (RM)
THE SCOPE OF ELECTRICITY
1
Reduce the load in the evening in block A
38,016.00
13,875.84
2
Reduce the load in the evening in block B
31,680.00
11,563.20
3
Switch off lights and equipment domestic at lunch
12,672.00
4,625.28
hour for 1 hour in block A
4
Switch off lights and equipment domestic at lunch
28,512.00
10,406.88
hour for 1 hour in block A
THE SCOPE OF MECHANICAL
1
Closing doors and windows to prevent the infiltration
40,603.20
14,820.17
of external air to air conditioned space
2
Reduction of operating hours of the air conditioning
369,132.72
134,733.44
from 11 hours to 10 hours
3
Do water-balancing and coordinating the
40,603.20
14,820.17
temperature to 24 º C at each work space
4
Allow only 2 elevators (for block A and B) on standby
12,472.20
4,552.35
during off-hours and holidays compared with 12
elevators during office hours currently. It is estimated
that 65% of energy consumed can be saved.
TOTAL
573,691.32
209,397.33
2) ENERGY SAVING MEASURES WITH COST
No.
RECOMMENDED
ESTIMATED YEARLY ESTIMATED ANNUAL
ENERGY MEASURES
SAVINGS (kWh)
SAVINGS (RM)
THE SCOPE OF ELECTRICITY
1
Fix timer switches in the parking area in block A
8,383.00
3,059.62
2
Put switch lighting controls in each room at block A
10,644.48
3,885.24
and B
3
Put switch lighting controls in the parking area
39,783.74
14,521.07
THE SCOPE OF MECHANICAL
1
Chiller replacement at block A and B that complies
1,396,048.90
145,826.30
with the Minimum requirements of MS1525:2014
2
Replacement motor for the chilled water pump for
5,169.12
1,886.73
blocks A and B
3
Replacement of the condenser water pump for
12,801.36
4,672.49
blocks A and B
4
Fan motor replacement AHU for blocks A and B
19,489.22
7,113.57
TOTAL
1,492,339.82
180,965.02
6