Ingenieur Vol 58 April-June 2014 Ingenieur Vol 58 April-June 2014 | Page 32

INGENIEUR ID Registration Cube Preparation RFID Tag Request •Project details • Via online •Login ID & Password will be given • RFID tags will be provided Application of Testing •Embed tag onto wet cubes •Online application •Data entry – cube details •Deliver cubes to MKRM/lab •RFID Reader will be provided RFID tags RFID Reader Figure 7 Process Involved in the Contractor Side   Figure 7 Process Involved in the Contractor Side Receiving cube Concrete Cube Compression Test •Verify all cubes Test •Every tested cube will be uploaded delivered to MKRM automatically that into servercorrect only the Result verification •T est data verified & approved After the cubes have cured they are for testing. •Ready for is scanned Each cube and verified by the system to ensure scheduled cubes are being tested. viewing All data measurements are electronically captured and input into the system instantly as all electronic equipment in MKRM have the necessary tools installed. This measure safeguards the security of data and measurement taken and minimises human interaction with the data hence reducing the risk of data tampering. Result verification Upon the completion of testing, the system’s software generates test results automatically. However it requires the Test Figure 8 Process involved inthe test results and submit them to the Engineer to review all the testing lab authorised person usually the Technical Manager for verification before test results can be issued to all relevant parties. This merely takes a few minute upon the completion of testing. Figure 8 Process involved in the testing lab Figure 8 shows the process in the laboratory. The client or consultant and contractor are able to view the results instantly and virtually anywhere. 58 APRIL 2013 process of retrieving the concrete test results at site is crucial to VOL 55 JUNE – JUNE 2014 6 30 VOL The prompt project management for the client to make vital and quick decisions at the site.