As serious as it sounds , flange management is not rocket science , but if not handled with proper care in hazardous industries , disaster can happen .
CONCLUSION
Another area to be seriously considered in high-risk piping systems is the Leak Test , or Pressure Test , to check the integrity of the newly installed flange connection with a relatively safe test medium and controlled test pressure before actual usage . The logic behind this is the early detection of any failure at the flange joint connection , to prevent any incident from occurring . As serious as it sounds , flange management is not rocket science , but if not handled with proper care in hazardous industries , disaster can happen . As a general rule , all organisations in Malaysia need to be aware that the Employer is responsible for providing a safe and healthy working environment to their employees , per OSHA 1994 Section 15 .
REFERENCE
Occupational Safety and Health Act 1994 ( OSHA ) ( Act 514 )
“ Piper Alpha – What have we learned ”, by Fiona Macleod and Stephen Richardson , Institution of Chemical Engineers , UK ( IChemE ), Loss Prevention Bulletin 261 , June 2018
The American Society of Mechanical Engineers , ASME PCC-1 ( 2013 ), Guidelines for Pressure Boundary Bolted Flange Joint Assembly
NORSOK STANDARD L-005 ( Rev . 1 , Sep . 2003 ) Compact flanged connections
www . twi-global . com / technical-knowledge / jobknowledge / mechanical-testing-tensile-testingpart-1-069 ( Accessed on 14 / Apr / 2023 )