The Borough of Jefferson Hills
Administration, Engineering, and Public
Works Departments have been hard at
work over the past months addressing
a number of projects and challenges
throughout the community. Work on
these public investments will continue
during the late summer and into the
fall. The completion of these projects is
through the utilization of tax revenues
collected from Borough residents and
businesses. It is the responsibility of
the Borough to not only complete
and maintain these assets, but also to
communicate these efforts to residents.
Enjoy!
Andrew Reilly Memorial Park Baseball
Infield Improvements
• Contractor – DuraEdge Tools &
Equipment, LLC
• Total Contract Amount - $19,758.00
• Work was completed in May, 2019
This project involved the rehabilitation
of the two (2) main baseball fields at
Andrew Reilly Memorial Park. Work
included regrading the existing fields and
laying a new infield with laser grading to
ensure positive drainage. Additionally,
the Borough purchased a 4500Z Ventrac
54
WEST JEFFERSON HILLS
tractor with site-specific attachments for
the Public Works Department to maintain
the baseball fields at Andrew Reilly
Memorial, Beedle, and Tepe Parks.
Borough Building ADA Door Handles
• Contractor – Select Contracting, LLC
• Total Contract Amount - $20,200.00
• CDBG Year 44 Grant Amount -
$10,100.00
• Work was completed in July, 2019
This project involves the replacement
of approximately fifty (50) non-compliant
door handles in the Jefferson Hills
Municipal Buildings with ADA compliant
door handles. CDBG Year 44 funding
covers 50% of the project cost of
$20,000.00.
2019 Paving Program
• Contractor – Alex E. Paris Contracting
• Total Contract Amount - $645,110.00
• Work was substantially completed in
July, 2019
The paving project involves the milling
and paving of the following roads in
the Borough: Snee Drive, Gilmore Drive,
Oneida Drive, Roberts Lane, Nicomar
Drive, Adams Drive, Adams Court,
Franklin Court, Dale Street and Beams
Run Road.
With the exception of Gilmore Drive
and Oneida Drive, the Borough has
completed its paving schedule for
2019. The work on Gilmore and Oneida
Drives will happen after Allegheny
County completes work on Worthington
Road. Oneida and Gilmore Drives are
anticipated to be paved in August or
September, 2019.
West Elizabeth Sewershed 537 Plan
Capital Improvements
• Contractor – Jet Jack, Inc., Global
Heavy Corp., and A-1 Electric, Inc.
• Total Contract Amount -
$7,050,000.00
• Funding Source – Pennvest Loan
Project includes the installation of a
pump station, flow equalization tank,
and forcemain along State Road (SR) 837.
The project also includes the upsizing of
the gravity sewers along Walton Road,
Scotia Hollow, and SR 837. The project’s
outcome will improve the performance of
the sanitary sewers in the West Elizabeth
Sewershed during wet weather flow
and eliminate Sanitary Sewer Overflows
(SSO’s).