Department of Public Works /Parks/Buildings | Bill Paiano, Director Looking back on how the year progressed, it has been a challenging year. The Public Works Department, throughout changes to management, key veteran members, weather conditions and large scale projects, had a very productive year. Below are the highlights of the year. Personnel The year started with Bill Paiano assuming the position of Director of Public Works and Rory Hogan moving from mechanic to foreman. Jason Davis was hired in late fall of 2018 as the mechanic. Pat Keibler, truck driver/former mechanic, retired after a long absence due to health issues. Corey Bohinc was promoted to fill this position. Mark Zeigler was hired to take the vacated laborer’s position. Rory Hogan suddenly resigned from employment with Murrysville. Ron Hileman assumed the position of Foreman, giving the Department a “plug and play” benefit of his many years of experience. Mike Chinchock retired as a truck driver after thirty-eight years of service. Josh Dallo was promoted to truck driver and Robert Dallo was hired as a laborer in late November 2019. Ron Hileman returned to his previous job as heavy equipment operator and Michael Jakub was interviewed and hired as the Public Works Foreman. He began the first week of January 2020. Major Purchases for 2019 • 308 Cat Excavator • Two Zero-Turn Mowers - These are to replace mowers with high engine hours for the parks system. • Chevy 1500 Pickup Truck – This vehicle replaced car 7 • Cat Asphalt Roller – This replaced the aging 1997 roller • 2019 Ford F-250 – This vehicle replaced a 2007 F-250 with high mileage and a rust condition. Major Projects Heritage Trail • Two pipes replaced in Duff Park – 24” and 15” were installed to alleviate a frequent occurrence of the parking lot flooding and damage done to the surface; • Crane pads for the Heritage Trail were installed for trail bridge rehabilitation at the Fox Plaza; • 100 Feet of 18” pipe installed in Cleveland Brothers’ detention pond; • 80 Feet of 60” pipe (major undertaking just behind the Murrysville electronic sign); 50 MURRYSVILLE • 60 Feet of 18” pipe installed into a catch basin on School Road South crossing • • • • • • • • • • • MCP Spray Park and Playground Removed topsoil from the site and placed approximately 7,000 yards of fill. Excavated and stoned with 240 Ton of 2B limestone the foundation of the spray pad Poured a concrete pad to construct a 20’ X 20’ pavilion built by crew Graded, installed fabric, and stoned the parking area Installed inlet and all storm water drainage Top soiled and seeded banks Assisted in setting bathroom, connected all utilities, including complex manifold to run Spray Park Attractions Graded, stoned, and poured a concrete sidewalk around the bathroom Built a retaining wall around bathroom area Graded, stoned, and asphalted a walking trail and handicap parking • • • Bear Hollow Park Demolished existing playground structure Prepared parking lot for fabric and seal coating Constructed a concrete border around the playground equipment and installed safety surface. • • • • Culverts and Storm Sewers Replacement of a 42” pipe and headwall on Beighley Road and the grouting of a storm sewer in Heritage Estates. On Ashbaugh Road repaired seven cross pipes, 500’ of side drainage and installed 400’ of asphalt shoulder. Made tie-ins to our underdrain system on Ivy Drive. Installed one cross pipe and some 350’ of side drainage on Windover Road. Maintenance Activities The Berming program: cutting road shoulders where needed, and filling approximately 500 tons of milling material in low edges. Placed 150 yards of safety surface material and repairs to many playground fixtures and wood timber surrounds identified in the playground equipment audit. Prep roads for an alternative surface treatment consisting of two coats of a shot chip process with fiberglass reinforcing added. The surface was later covered with crack oil that hardens to a durable finish. Twenty-five spots on Weistertown and three in Bear Hollow Park were milled and patched for this treatment. Milled and patched roads in Murry Woods Plan, Sienna Ridge Plan and Heritage Estates. A pipe was replaced on lower Ashbaugh Road and a pipe with an inlet box on Wilcox Circle was installed.