IN Murrysville Spring 2019 | Page 45

Rails to Trails/Roberts Property • Installed a pipe to carry water past the Bicentennial Bikeway • Installed a solar panel and charging system for the police UTV • Built and erected a bike sculpture for the entrance of Robert’s trail head Department of Engineering | Scott E. Hilty, Director