IN Fox Chapel Area Fall 2017 | Page 25

2016-2017 f ox c hapel a rea s chool d istrict s tate of the s chools Another proposed feature of the new Kerr is the addition of a language immersion program that would allow students to be taught in both English and Spanish during the entire school day. Students from all four elementary schools would have the opportunity to enroll in the new program. Additionally, there are plans to include open areas outside of the building that would be designated for instructional purposes and a pre-kindergarten program is being proposed to help children better prepare for school. The decision to build a new Kerr came after lengthy research and discussion when the School Board and administration concluded that even with extensive renovations, the nearly 90-year-old building would be inadequate, both structurally and programmatically. Additionally, a renovation would not have been cost-effective in the long run. Public meetings have been held with parents, Kerr neighbors, and other interested residents. Planning for the new building will continue throughout the 2017-2018 school year and there is no plan to redistrict students to different elementary schools. Additionally, Kerr students will not be displaced during the construction of the new building. Additional Renovations Renovations began in the summer of 2016 at Dorseyville Middle School and the summer of 2017 at Fairview and O’Hara elementary schools. Renovations at all three schools include new office spaces and upgrades to improve the safety and security of students and staff, as well as mechanical upgrades. Additionally, makerspaces are being added at DMS and O’Hara, and common spaces were renovated. To make the entry and exit from Hartwood and Dorseyville safer and easier to navigate, a new driveway was also added. Dorseyville Middle School had upgrades to the gymnasium, the food lab, and the art classrooms. O’Hara is also receiving upgrades to the library, art rooms, and hallways; is getting three new special education classrooms; and is getting a new playground area and equipment. Fox Chapel Area | Fall 2017 | icmags.com 23