Improving Hong Kong Street Waste Disposal Experience May 2019 | Page 93

Key Learnings 2. TEAM SETUP We have 4 dedicated members from Design Change to work on this project: There are a few key learnings for us in the past 6 months: 1. SCOPING Project Manager Experience Designer At the start of the project, we wanted to address 2 questions through this project: A. HMW use design to help reduce street rubbish dumping, increase recycling frequency and generate positive awareness around the needs for waste segmentation & recycling from the locals? B. HMW use design to create better ways of working for garbage collectors & recyclers and make their daily job duties easier and more meaningful? Initially, we thought the main pain point and hence design will be around the garbage bin. But as we progressed through our user research, we realized we were wrong, the biggest challenges lay much broader than just the bin. It is very exciting for the team but at the same time made the project much more challenging For the next project, we need to better scope the challenge we want to address by doing more initial research before deep diving into it. Strategist Art Director This structure was working fine in the discover, define and ideation phase. At the start of the project, we separated the team down into 2 streams: garbage throwers and garbage collectors. It all worked fine until we reached design phase where we needed to actually sketch out all our amazing ideas. We only had 1 member who can do the sketching, creating a lot of workload for him which as a result slowed down the project as a whole. For our next project, we will need to come up with a phasing plan after the initial research that we mentioned above and build a team around it instead of the other way round. 3. WAYS OF WORKING All four of us in the team have a day job. It is quite difficult to find a time for everyone to meet on a weekly basis. The decision breaking the team into 2 streams was a good one so members with similar work schedules can work more closely together. However, during later phase of project when we needed to have more full team meeting, this was where the challenge came. Meetings got canceled due to our work schedule and we ended up making decision with smaller groups or individually which caused misalignment afterwards and members got disengaged. For our next project, we need to set a fix date and time during the week as a regular meeting and commit to give updates, make decisions as well as splitting the tasks. 142 Design Change x Design Trust Design Change x Design Tr u st 143