IM November/December 2024 November/December 2024 | Page 39
We ’ ve designed and built heap leach projects since heap leaching was first developed in the early 1970 ’ s .
EVERY HEAP IS DIFFERENT .
There are still a lot of failures – due to permeability , heap stability , or lack of respect for the topography – KCA can ensure that your heap starts up quickly , and works as designed . We are not just design engineers – we acted as EPCM contractors on the heaps in these photos – if you want experience and innovation on your side , call us for your next project .
WWW . KCARENO . COM CALL CARL OR DAN ( US ) 775- 972-7575