PASTE & FILTERED TAILINGS
The underground paste backfill storage tanks at Big Gossan . Courtesy PT-FI
Backfill innovation for Big Gossan
At PT-FI ' s Grasberg operation in Indonesia , a team from WSP designed an innovative paste backfill solution for the Big Gossan mine
Located near Indonesia ’ s highest peaks in the island ’ s interior and accessible via a twisting road with very steep gradients , Grasberg is an extreme example of how the search for resources calls for determination and ingenuity . Some of that ingenuity came from Golder Associates ’ ( now WSP ) work on a key part of Grasberg ’ s infrastructure .
The operators of Grasberg , PT Freeport Indonesia ( PT-FI ), called on WSP to design , implement , and oversee the commissioning of a paste backfill plant at Grasberg ’ s Big Gossan mine . As a part of the Grasberg mining complex ,
At WSP , pursuing a greener future inspires us to innovate and deliver impactful and sustainable solutions .
Be part of our team doing purposeful work in mining , solving the challenges of today , and tomorrow .
wsp . com / mining
the largest gold mine and the second-largest copper mine in the world , the Grasberg mine site offered only a small patch of level ground , which would be occupied by the mine ’ s mill . This meant that the paste plant would have to fit underground , inside the mountain .
The copper-gold orebody is being extracted by the blast hole stoping method , in which stopes are excavated to remove the ore . To safely mine the adjacent stopes , the mined stope must be refilled with paste backfill , made up of classified dewatered tailings , water and cement . The paste backfill cures to a strength that supports the rock overhead , so mining can continue . This means that having a regular , reliable supply of paste backfill is essential to continued production at Big Gossan - regardless of the challenging location .
Many above-ground paste plants are designed to fit inside a building on the surface , containing all the components of the plant . For this underground construction , the team determined that keeping everything together in one large excavation would not be feasible , based on the need to keep the excavated spaces compact yet functional , and to not over stress the rock overhead .
Accordingly , the paste plant at Big Gossan is divided into several parts . These are fitted into a series of underground cavities , including one for the series of three disc filters , separate vertical spaces for the paste batch mixing system and binder storage areas , and another horizontal space for the entry-way housing the paste pumps , electrical room and control room . The paste plant infrastructure includes a range of tunnel sizes , including vertical components and cut outs that link the whole system together .
It is a challenge for large vehicles to access the mine owing to the constrictive mine access tunnels and the steepness of the road leading to the mine . This meant a change in the usual way of delivering cement , an essential component of paste . Rather than using large bulk transport trailers with 40 t capacity , Freeport and WSP
chose to rely on smaller isotainers carrying 25 t of cement . This called for the operations to carefully schedule and manage traffic , to allow for a smooth supply of cement to the paste plant .
One of the benefits of the paste plant ’ s underground location is that it could be placed above most of the orebody . This allows the paste to be distributed primarily through a gravity feed , with little need for pumping . As the mine expands , it will become necessary to operate piston pumps to deliver paste to the stopes at the outer extents of the mine .
The tailings produced by the mill that feeds the Big Gossan paste plant tend to be finer than is optimal for paste . Tailings containing too high a percentage of small particles or fines require a prohibitively large volume of cement , in terms of cost , to create a paste that has the required structural rigidity and load-bearing capacity . To avoid excessive use of cement , and the associated cost , the design included a cyclone that separates out some of the fines in the tailings before the remaining tailings are used for processing .
The initial commissioning brought the plant online and operating at partial capacity for the first few years , meeting the needs of the mine at the time . The team later returned to support our client in bringing the plant up to its full design capacity of 300 t of paste per hour .
The team ’ s underground design for the paste plant allows the Big Gossan mine to operate efficiently and maintain the necessary stability despite the challenging mountainous terrain found in the remarkable Grasberg minerals district .
PT-FI is owned 48.76 % by Freeport McMoRan which manages the operation , with the remainder controlled by Mining Industry Indonesia ( MIND ID ), Indonesia ' s mining industry holding company . Grasberg currently has three underground operating mines in the Grasberg minerals district : Grasberg Block Cave , Deep Mill Level Zone ( DMLZ ) and Big Gossan .
In its latest results for Q4 2022 , Freeport McMoran states that PT-FI ' s milling rates for ore extracted from its underground mines averaged 198,100 t of ore per day in that quarter . The installation of additional milling facilities at PT-FI is currently expected to be completed in late 2023 , which would increase milling capacity to approximately 240,000 t of ore per day to provide for continued annualised copper and gold production volumes of approximately 1.6 billion pounds of copper and 1.6 Moz of gold . PT- FI is also advancing a mill recovery project with the installation of a new copper cleaner circuit that is expected to be completed in 2024 , which is expected to provide incremental metal production of approximately 60 Mlb of copper
and 40,000 oz of gold per year .