IM 2019 July 19 | Page 31

HIGH PROFILE mechanised pipe changing has become available for V-30 slot raising. This reduces the number of units operated in the production drift at the same time as the storage capacity of a pipe changer is up to 40 m. Mines are constantly seeking possibilities for improving hole accuracy, to minimising ore loss and dilution and to improve rock fragmentation at the bottom of the stopes. At the end of the day, accuracy is a function of the measures you implement and your drill operator’s abilities. The following factors are important to consider in this process: n Drilling equipment that fulfil the requirements of the mining method and drill plans n The use of large size rock tools compared to the hole diameter drilled n Correct alignment of holes and good drill stability during drilling n Drilling parameter settings which are optimised to hole and rock conditions n Implementing drill operator KPI's based on accuracy rather than metres Hole alignment is a key element in controlling hole accuracy. Most longhole drills utilise laser point-based carrier positioning at the fans, after which one of the fan pivot points (position in the drift) is shown to the unit (by moving the boom rotation centre to the position). With the introduction of the 400i-class longhole drills bit navigation will become available for added accuracy in hole alignment. The Drill Plan Visualizer can be used in creating drill plans suitable for upload on the drill’s control system, and in retrieving the as-drilled data back for reporting and visualisation. To have each hole aligned within the specified system accuracy and on the correct collaring point requires careful use of the instruments, continuously and well-maintained machine and a drill operator who is motivated to align all holes accurately, so that accuracy can be achieved on each hole.   Sandvik’s offering framework for digitalised longhole drilling Sandvik’s product offering is designed to meet the industry requirements in the following way: n Autonomous equipment and features: the units are fitted with onboard autonomous features, smart rock tools and control systems for remote to autonomous operations, supporting the operator or fully taking over manual tasks n The equipment is connected: transfer, collection, reporting and visualisation of as- drilled data and data on fleet health and status is continuous, assisting in remote and real-time support for planning and monitoring across sites n Tools for analytics and process optimisation: solutions based on processed data from equipment, rock tools, customers’ systems, environment, predictive insights and real-time analytics are available to improve operator and asset performance   Bestselling longhole drills For drilling long, large diameter and accurate production holes the boom and the boom support of a longhole drill must ensure absolute stability during drilling; for this reason, the leading mining contractors prefer products with horseshoe type boom support and a telescopic boom. The telescopic boom allows pivot points to be set on a line, which helps in planning the drilling pattern and in matching the plan with the stope plan and orebody. Sandvik’s DL421 is the most popular longhole drill in the market in mass mining, in 4 x 4 m or larger cross sections, providing a proven track record in drilling capacity, hole accuracy and productivity; with the introduction of bit changer complete fans can be drilled in automation. The number of units fitted with onboard air supply for air mist drilling is increasing. Experience has shown that penetration rates are 10-15% higher compared to water flushing; cuttings mix with air-to-water mist and in many cases also stabilise the walls of the hole. The minimum uphole velocity is 15-25 m/s and this determines the capacity of the air compressor for different hole/rod diameter combinations. IM Rein nforcin ing g Pro ogres ss Yo u want to advance yo our operations efficiently. To T o im mpr ove safety. T To o minimise down ntime and maximise productivity y and performance. We have the people and the products for eve ery challenge, and a supply chain c you can rely on to deliver. W ou Working alongside you, we help yo bjectives – quickly, reliably, cost-e effectively. progress towards your ob dsiunderground.c com JULY 2019 | International Mining 29