IM 2019 August 19 | Page 18

MINE HOISTS fully automatic mode and shaft sinking operations can also be controlled from the same console. The service hoist is a Hepburn 94.5” diameter x 86” wide, single drum hoist with a rope pull rating of 140 kN (31,500 lb), disc brakes, one 1,500 hp, low- voltage, AC electric motor and drive with Hepburn digital controls. The same 1,500 hp electric motor is In February 2019 Hepburn Engineering Inc announced it had acquired all of DavyMarkham’s Intellectual Property assets sheaves and other hoisting related equipment for the global mining Industry. With this acquisition, DavyMarkham joins Hepburn’s OEM parts and service product portfolio that includes the hoisting technology of the former Canadian Ingersoll Rand (CIR), Fullerton, Hodgart & common to both the service and the production hoist. Hepburn Engineering says it won this contract based on the acknowledged performance and reliability of previous Hepburn hoists and AC drive system installations. NMT gets key sheave contracts Barclay (FH&B), Westinghouse and Ottumwa.” John Hepburn, President of Hepburn Engineering commented: “Hepburn is a global Nordic Minesteel Technologies Inc (NMT), an expert company in horizontal and vertical solutions for mining, has expanded its shaft equipment portfolio to include industry leading leader in the design, analysis, engineering, manufacture and service of mine hoisting technology and the acquisition of the DavyMarkham Limited Intellectual Property further strengthens our offerings to our compensating sheaves. Two recent contracts awarded from Glencore – Onaping Depth and Kirkland Lake Gold – shaft #4. According to Gio Cortolezzis, Project Procurement Manager: “Nordic Minesteel presented a very good customers. Both Hepburn and DavyMarkham have always had a strong reputation for delivering robust mine hoisting equipment. We proposal to Glencore. We feel they bring the expertise, organisation and experience necessary to ensure success on a challenging project, such as are encouraging any prior customers of DavyMarkham Ltd to contact us directly to seamlessly provide continued support for both ours at Onaping Depth.” “We are very pleased to be working with Glencore and Kirkland Lake Gold on these significant and technically challenging projects. spare parts and equipment servicing.” Following a two year shaft sinking project, Tahoe Canada (now Pan American Silver) is on track to doubling production at the Bell Creek Mine operation in Timmins, Ontario. The new shaft has been in operation since December 2018 with a production hoist and service hoist supplied and commissioned by Hepburn Engineering Inc. The current shaft bottom is at the 1,080 m level but the hoist, the headframe and other infrastructure has been designed to be capable of operating down to the 2,000 m level if the shaft is deepened. The production hoist is a Hepburn 144” diameter x 86” wide, double drum hoist with a rope pull rating of 337 kN (75,600 lb) and a payload of 9.5 t. The hoist has a sliding gear type clutch, spring applied, hydraulically released disc brakes, two 1500 hp, low-voltage, AC electric motors and TMEIC AC drives. The Hepburn digital controls include a Hepburn Hoist Manager HMI and a Hepburn Digital Safety Monitor. The hoist can be operated in manual, semi-automatic or 16 International Mining | AUGUST 2019 An expert Shaft Equipment Engineer, Jim Brownlee joined our NMT team in 2016 to better serve our customers in this competitive industry,” said Richard DeRuiter, Vice President – Business Development, Nordic Minesteel Technologies Inc. Compensating sheaves are most commonly supplied for a “Blair” type hoist application. The Blair arrangement uses two sheaves side by side, for two connections to the skip or cage. This safely allows conveyances to run on steel guides. Becker Mining rope attachments for SA diamond mine Becker Mining Systems says it has recently stepped up to the challenge of quick turn-around time for the manufacture of rope attachments for a diamond mine in South Africa. “We received the order at the end of August 2018, with the requirement to deliver before the end of December 2018,” says Tom Searle, Becker Mining SA. “This large order would normally take between six and eight months to complete, A recent Becker Mining project for a South Africa diamond mine included the manufacture of a complete running set and a spare set of Koepe attachments for two rock winders however, we managed to finish the work in three and a half months. The fully-machined components - with a total mass of 53 t - were packed in 49 large wooden crates and delivered for long term storage, ahead of our deadline.” This project included the manufacture of a complete running set and a spare set of Koepe attachments for two rock winders. Each set suits four off 46 mm headropes and four off 48 mm tail ropes. The order also comprised four sets of 30 t rocket type safety detaching hook sets supplied for the man winder and 10 t rocket type hooksets for the service cage. Jack catch boxes, jack catch lugs and posts were also supplied for each conveyance. Becker Mining also supplied WRC clamps that were used during installation and will be utilised in future maintenance of ropes. The completed job included all the statutory testing requirements, to fully certify the equipment in line with the necessary specifications, including mine health and safety acts and mining regulations. Twiflex provides escape hoist brake solution A major mine hoist OEM recently needed a custom braking solution for an emergency escape hoist positioned in a mine ventilation shaft. In an emergency, when the mine’s large primary hoist is not accessible, the escape hoist can be utilised to transport workers to the surface quickly. To meet the hoist’s emergency stopping and parking application requirements, Twiflex provided Series VKSD spring-applied, hydraulically released, dual-spring caliper brakes acting on a pair of discs shaft-mounted to the hoist’s cable reel. The Twiflex model VKSD58 disc brakes supplied feature a braking force of 58 kN. The brakes were modified to meet the customer’s mounting requirements and proximity switches were mounted to the end covers. A SOBO iQ hydraulic power unit and a SOBO iQ control were supplied by Svendborg Brakes.