IM 2017 June 17 | Page 60

HEAVY ENGINEERING historical manual operations. The machine named "Relay" by the employees will produce 80 links per hour compared to 10 to 20 links per hour in the past using a flash butt weld manufacturing methodology. The new equipment will be used to complement the existing capacity, thereby providing both economies of scale and agility to manufacture masterlink products respectively. In the mining steel plate sector, production has commenced on the latest addition to Brown McFarlane’s wide range of processing machines. The Bystronic BySprint Pro represents a total investment of over £4 million by the company as it says it walks “into a new age of steel plate processing.” Purchased in order to help Brown McFarlane keep pace with demand, the company’s project management services “continue to attract increasingly large and complex orders. The machine increases the company’s cutting capacity allowing a better service to be offered to its customers.” The BySprint Pro offers a range of new technologies that the company will now be able to offer to customers. “Able to deliver pin point accuracy, laser profiling has never been so precise. This ensures that customers receive perfect profiles to their exact bespoke needs. With a low thermal influence, laser machining allows a reduction in work piece contamination. With little to no heat affected zones, this prevents any issues with welding on possible brittle areas. As well as being accurate and efficient, our laser cutting is reliable and fast. Enabling multiple cuts to be made in one motorised process, Brown McFarlane can produce ready to use products straight from the laser bed. With no need for any secondary machining, customers can receive their profiles even quicker with our laser machine.” Brown McFarlane says it will be able to use this technology to offer a new range of precision cutting services to its customers which can save them time and money by reducing the need for secondary operations in their works. Castings and gearing When it comes to making large castings, ME Elecmetal states that foresight is of utmost importance. “Fundamental infrastructure needs to be put in place to safely manufacture large castings and maintain casting integrity. Things like crane capacity, large capacity melting furnaces, mould capacity along with the ability to deliver large quantities of sand, cannot be overlooked. In addition, heat treat furnaces need to be considered. The door size of the furnace and the delivery mechanism have to be thought through long before a casting is poured. If the casting is subject to radiography acceptance criteria, the source and the size it can handle needs to be established.” 58 International Mining | JUNE 2017 Next comes the important part of designing the casting to be made in the most efficient manner. “Seemingly small items like pattern draft to avoid excess coring need to be thought through, minimising cost in tooling and manufacturing. Riser location and the plumbing to deliver molten metal to the mould need to be designed. Today foundries depend on sophisticated software programs, establishing the most efficient way to deliver the metal, paying close attention to directional solidification to assure proper soundness.” Critical areas of the casting need to be determined and tests and ac