IIST SYLLABUS 1 | Page 38

delegation, leadership, directing, and controlling.  Project  Management:  Development  of  project  network  –  project  representation  –  project  scheduling – linear time‐cost trade‐offs in projects: a heuristic approach – project monitoring and  control with PERT.   References:  2. 3. 4. 5. 6. 1. Koontz H., O’Donnel, C., and Weihrich, H., Essentials of Management, McGraw‐Hill  (1990).   Venkataratnam, C. S. and Srivastava, B. K., Personnel Management and Human  Resources, Tata McGraw‐Hill (1991).   Mazda F., Engineering Management, Prentice Hall (1997).   Gido, J. and Clements, J. P., Successful Project Management, 2nd ed., South‐Western  College Publishing (2003).   Khanna, O. P., Industrial Engineering and Management, Dhanpat Rai Publications (P)  Ltd. (2003).   Memoria, C. B. and Gankar, S. V., Personnel Management ‐ Text and Cases, Himalaya  Publishing House (2007).        AV341  1. 2. 3. 4. 5. 6. 7. 8. 9. 10.    COMPUTER NETWORKS LAB  (0 ‐ 0 ‐ 3)  1 credit    Basics of Network Simulator NS‐2  Usage of 'awk' parser and trace file formats.  Goodput Vs Throughput measurement  Comparison of Static Vs Dynamic Routing  Ethernet behaviour  Early Packet Drop Regimes  Switching schemes  Routing Protocols  Multicast Routing Protocols  TCP Congestion Control methods       AV342     POWER ELECTRONICS LAB  Part I – Simulation using MATLAB and PSpice  • Uncontrolled and Controlled rectification  • Dc‐dc converters  • Inverters  • Drives   Part II – Laboratory practice  • Study of SCR and determination of SCR parameters  • R and RC firing circuits for thyristors  • Controlled and uncontrolled rectifier circuits.  • Dc Motor Speed Control  • Linear and Switching Regulator  • DC ‐ DC converter design  38 (0 ‐ 0 ‐ 3)  1 credit