Early AI Diagnostics at Westinghouse few days. Replacement power is typically cheaper on weekends because total demand for power is lower than during the weekdays. Even if the outage cannot be moved, detection of the equipment condition can allow preparation for the outage by having parts and tools available. A predictive diagnostic system could assist in recognizing impending outage and potentially mitigate its consequences. V ALUE When an unplanned (forced) outage occurs at a power plant, its impact is millions of dollars. Detecting an imminent forced outage and converting it to a scheduled outage can potentially reduce the impact significantly, even if the outage is moved from a weekday with higher peak usage to a weekend with lower peak usage by only a Figure 1: A steam Turbine Generator, ca. 1985. The largest component is the generator, which would be about 10 to 15 feet high. Behind the generator is the low-pressure turbine. 1 - 7 - June 2019