[ case study ]
inevitably occurred, but advanced planning and risk management strategies – combined with continuous efforts to improve the schedule wherever possible – neutralised the effects of any delays.
With a herculean effort by the integrated team and all the contractors, the project was completed on time. Looking back, there were several areas where the timeline could have been improved further without compromising on project risks, and we keep those lessons learned in our toolbox for the next‘ ultra fast-track’ project.
One of the most important decisions made from the outset was hiring the right people to execute the project. A company is only as good as its people, and their knowledge and experience proved invaluable time and time again. We take great pride in the dedication and expertise of our team and are deeply grateful to the contractors and suppliers for their contributions.
About StreamTec Solutions
StreamTec Solutions( STS) was contracted as the overall project management consultant for the OAL project and formed a joint integrated team with the clients. STS led all phases, from conceptual design to cold commissioning. STS’ s team developed the technical concept and project specifications, planned the required technical and environmental surveys, prepared application documentation, and managed contract tenders.
STS is a global supplier of project management and consultancy services for oil & gas developments, renewable energy, infrastructure projects, and energy transportation systems. More recently, STS has won contracts to support the development of multiple offshore hydrogen pipeline projects, notably the Baltic Hydrogen Collector( BHC) and the Nordic Baltic Hydrogen Corridor( NBHC) on behalf of Gasgrid.